Floatgen's anchors have been delivered

Tuesday 13 Dec 2016

The 6 anchors which will equip the floating system have been unloaded on Saint-Nazaire harbour. There will be assembled and then installed offshore in spring 2017 as well as synthetic mooring lines (which are also stored at the same place).

glqxz9283 sfy39587stf02 mnesdcuix8